Tel: 86-510-86515678
;

News

Home > News
Measures to prevent explosion of liquid oxygen pump
Before starting the liquid oxygen pump to cool down, the blowing valve should be open and connected to the room temperature nitrogen blowing labyrinth for 10-20 minutes. On the one hand, the oxygen driver is left and at the same time the seal is returned to the normal temperature gap.

After turning, confirm that there is no fault, start the water pump, and pay attention to the stability of the inlet pressure of the pump. If the pressure fluctuates or the outlet pressure does not rise, cavitation may occur. The exhaust valve body on the pump must be opened to continue to cool the liquid oxygen pump. Stable to control the pressure of the sealing gas to be higher than the pressure of 01005-0101 MPa before the sealing.
Previous:  Another important use of ozone is for water...    Next:  Market demand for nitrogen generators

CORYRIGHT?2020 Jiangyin Shenma Machinery Equipment Co., Ltd.
蘇ICP備07001906號(hào)-2   公安部備案號(hào):32028102000219 

主站蜘蛛池模板: 日韩一区二区不卡| 免费看亚洲| 亚洲第一黄色网| 国产精品v欧美精品v日韩精品| 久久福利国产| 天堂在线xw| 丁香六月 久久久| 欧美成人在线免费观看| 亚洲色视频在线播放网站| 国产拍自| 日本在线国产| 91桃色在线看片| 久久伊人男人的天堂网站| 午夜看黄| 国产国语对白精品视频| 欧美一二三区视频| 在线一级片| 精品一区二区三区四区五区| 四虎毛片| 第三人称复仇韩剧在线观看免费| 欧美日韩亚洲一区| 影音先锋色偷偷米奇四色| 韩日一区二区| 色偷偷伊人| 成人午夜视频免费观看| 欧美黄色免费在线观看| 在线欧美国产| 久久久国产99久久国产一| 午夜精品国产| 国产女人好爽好多水| 日本在线免费观看| 99re视频在线观看| 麻豆传煤视频| 亚洲免费播放| 国产亚洲第一| 日韩一级片免费观看| tube8xxxx| 欧美不卡一区二区三区| 亚洲自拍p| 黄片一级毛片| 四虎永久网站|